Summary of Services - BFC Gas & Electric
|
The BFC Gas & Electric project
is a 6 megawatt independent power plant which utilizes a biomass gasification
system. The plant is designed to use a variety of mixed industrial biomass
fuels. The fuel is processed and stored before being fed into a fluidized bed
gasification system. The gasifier provides low Btu gas to a 60,000 lb/hr, 450
psig, 825° boiler. The steam from the boiler is supplied to a reconditioned 7
1/2 megawatt turbine generator. All of the steam is utilized in the turbine.
The electricity generated from the facility is sold to the local utility company
under a long-term contract. The overall plant is primarily comprised of used
and reconditioned equipment with the exception of the 30,000 square foot fuel
processing building. All of the equipment was purchased from existing
facilities along with the gasification and boiler facility, which was previously
utilized in a similar application. The turbine generator was purchased and
reconditioned from a Midwest utility company. PES provided a variety of
services to the owners of the facility, including the following:
|
 |
Preparation of the site equipment plan for construction and project
permitting |
|
 |
Contacted used equipment dealers for
purchase of equipment |
|
 |
Provided
input for environmental permits |
|
 |
Developed detailed equipment layouts,
equipment arrangements, and final foundations |
|
 |
Developed specifications for all fuel
processing and handling equipment for the facility |
|
 |
Provided overall general project support |
|
 |
Provided
Field Consultant inspecting and oversaw the dismantling of equipment
at various locations throughout the U.S. |
|
 |
Performed design work on
disc screen and magnet structure, platforms, staircases, ducting for
the precipitator, disc screen, fuel bins, accumulation conveyors,
shredders, and pneumatic system layout, conveyor to the gasifier
metering bin, support structures, foundations for support structures
and hydraulic piping design |
|
 |
Specified, searched, evaluated, and
arranged the purchase of used equipment for plant |
|
 |
Provided overall project process and
PI&D support for the project |
|
 |
Organized equipment documents from
purchases |
|
 |
Provided field supervision for the
reassembly of the used equipment |
|